SafetyLockout
Lockout and tagout procedure
MTMaya Torres updated this May 12Version 43 min read
- 1Tell everyone affected that the equipment is going down.
- 2Shut the equipment down with its normal controls.
- 3Switch off and lock the main disconnect with your own lock.
- 4Attach your tag with your name and the time.
- 5Try to start the equipment to prove it is dead.
Never remove another person's lock. Find them or call the site manager.